Photo Gallery

Construction

Overland & Grasshopper Conveyors have been connected at the Moss Mine.
A sideview of one of the Crushers and its enclosed screen decks at the Moss Mine.
The backend of a large CAT front-end loader as it has just picked up a large bucketful of ore and is about to haul it to the Crushers at the Moss Mine.
OLD & NEW; the 125 year OLD Moss House shown here in the forefront and the NEW Crushing Facility in the background.  A part of the historic Moss Mine still stands and has been preserved onsite.
We have water!  Mine Optimization continues on; shown here a new bright yellow fire hydrant is proof of another completed installation at the Moss Mine.
Our Cement Silo stands tall and ready just a short distance away from the Crushers at the Moss Mine.  Cement aids as a binder for the fine ore particles in the agglomeration process and raises the PH for optimum gold and silver recovery.
A reel of belting awaits to be installed on the conveyors at the Moss Mine.  The conveyors are being readied to move ore through each step of the Crushing process.
An up close view of the track rollers of a bulldozer at the Moss Mine.  These tracks propel the bulldozer into motion just as each development in construction at the Moss Mine has built momentum for Northern Vertex to be that much closer to pouring gold.
All working together; a CAT front-end loader loads an articulated truck.  The various pieces of equipment work together to excavate & haul ore.  Each executing a vital step towards the mining, crushing, leaching and pouring of gold at the Moss Mine.
The wide blade of a bulldozer pushes together a large pile of ore that will be transported to the Crusher and then to the Heap Leach Pad for processing at the Moss Mine.
A rotary drill stands tall at the Moss Mine ready to conduct one of the first steps in the gold mining process.
A picturesque view of the Crushing Facility at the Moss Mine.
A close up view of the Moss Mine construction
A bulldozer moves the preload on the heap leach pad at the Moss Mine.
Blue skies and Crushers at the Moss Mine Crushing Facility
An eye level view of the skeleton of our conveyor belt at the Moss Mine.
A bulldozer pushes the ore on the Moss Mine heap leach pad.
A trio of CAT construction vehicles working together to haul ore at the Moss Mine.
A close up view of the side of one of our Crushers at the Moss Mine.
The Moss Mine heap leach pad from afar.
Our Cement Silo and Agglomeration Machine
Construction at the Moss Mine
Cement silo at the Moss Mine
Our trio of crushers at the Moss Mine.
Construction at the Moss Mine
Cement Silo arrives at the Moss Mine
Upclose to one of the cone crushers at the Moss Mine.
Moss Mine Construction - Agglomeration Drums
Moss Mine Construction - beginning stages of the crusher assembly
Moss Mine Construction - Cyanide Tank arrives on site.
Upclose view of the cyanide tank at the Moss Mine
Moss Mine Construction - Cone Crusher frame
Moss Mine Construction - first look at the assembly of the Fire Water Tank
Assembly begins for the cone crusher frames
Moss Mine - pond lined and filled
Delivery arrives of the cone crusher frame
Moss Mine - Power Pole installation underway to provide electricity to crushers and conveyors.
A convoy arrives at the Moss Mine to deliver the cone crusher frames
another convoy arrives at the Moss Mine to delivery another structure
Another Crusher comes through the security entrance at the Moss Mine.
Concrete pour for Meryl Crow plant
Moss Mine construction - Heap Leach Liner Pad Installation
Convoy of conveyors being trucked into the Moss Mine
CAT truck working the midnight oil
Moss Mine construction at night
Heap Leach liner installation at night
a shipment arrives - delivery of the pumps
Heap Leach liner installation at night
Moss Mine Laydown Yard
Heap Leach liner installation at night
Moss Mine - a view of an edge of the heap leach liner pad.
Agglomeration Drum arriving into Bullhead City
Merrill Crowe: Containment Walls at 400 Area
Night Time Pour on 650-TK-002 Tank Pad
View of Upper and Lower West Pad
Agglomeration Drum and Associated Equipment / Conveyors / Liner Material
View into Lower West Pad with Liner
Delivery of our first cone crusher top assembly.
Concrete pour at night.
Haulage Trucks In A Row
Contingency West Pond with Liner / 1st Liner Section of Lower West Pad
Moss Mine - Sequence of Liner
Moss Mine construction
Moss Mine construction
CAT vehicle working away
First truck delivery from JCI crushers.
Moss Mine construction - Concrete Pouring
Moss Mine construction - Caterpillar With Rocks
Moss Mine construction - vehicle haul
Moss Mine construction - Working Trucks
First Pour Concrete
Moss Mine construction
Moss Mine construction
Moss Mine construction
Moss Mine construction - building up the fire water tank
Moss Mine construction
Moss Mine construction
Conveyor on Moss Mine
Moss Mine construction - Drill
Construction of the Moss Mine Pilot Plant (2013)
Moss Mine Pilot Plant (2013)
Construction of the Moss Mine Pilot Plant (2013)

Moss Mine Site

Golden Vertex Gold Bars
Moss, October 2013
Moss Mine Desert Sunset
Moss Mine Under Construction
Entrance To Core Shack
Jeb Handwerger & Ken Berry on Route 66
Moss Mine Entrance
Lisa McCabe and Chelsea of Arizona Senator Flake
Leaching Operations 8 30 13 3
Overlooking the Moss Mine
Construction of the Moss Mine Pilot Plant (2013)
Team Photo (November 2012)
Corppreshome

Moss Exploration

Moss Mine construction - Drill
Staff Working
Moss Core
Moss Mine, March 2013
BHC - Personel

Community

Lil Red Schoolhouse
GVC Clean Up
Historical Moss Mine Headframe at dusk
BHC - Computer Center
GVC at the Career Fair
Moss, December 2013
Chip For Kids Charity Tournament (April 2013)
Golden Vertex Display 2017
GVC Center for Earth Science
Little Red School House
Headframe

Pilot Plant Reclamation

Desert Nursery
Backside of Pilot Plant Reclamation

Hercules Exploration